Microsoft test MB6-511 exam dumps Exam MB6-511 AX 4.0 Production MB6-511 Testing Engine - Test4pass

MB6-511 Exam

AX 4.0 Production

  • Exam Number/Code : MB6-511
  • Exam Name : AX 4.0 Production
  • Questions and Answers : 60 Q&As
  • Update Time: 2011-09-21
  • Price: $ 119.00 $ 69.00

Free MB6-511 Demo Download

Test4pass offers free demo for Microsoft Business Solutions MB6-511 exam (AX 4.0 Production). You can check out the interface, question quality and usability of our practice exams before you decide to buy it. We are the only one site can offer demo for almost all products.


 

Exam Description

It is well known that MB6-511 exam test is the hot exam of Microsoft certification. Test4pass offer you all the Q&A of the MB6-511 real test . It is the examination of the perfect combination and it will help you pass MB6-511 exam at the first time!

Why choose Test4pass MB6-511 braindumps

Quality and Value for the MB6-511 Exam
100% Guarantee to Pass Your MB6-511 Exam
Downloadable, Interactive MB6-511 Testing engines
Verified Answers Researched by Industry Experts
Drag and Drop questions as experienced in the Actual Exams
Practice Test Questions accompanied by exhibits
Our Practice Test Questions are backed by our 100% MONEY BACK GUARANTEE.

Microsoft Microsoft Business Solutions MB6-511 exam braindumps questions and answers

¡¡
¡¡
Exam : MBS MB6-511
Title : AX 4.0 Production


1. A company has insufficient machine capacity to meet the increased demand for its products. The company found a local machine shop that can provide the additional capacity. Prior to updating the routings, the subcontractor's machines need to be set up as work centers. What work center type should be assigned?
A. Machine
B. Tool
C. Vendor
D. Human resource
Answer: C

2. What are the types of production journals?
A. Picking list, Work center card
B. Picking list, Reported as finished, Operation card
C. Picking list, Reported as finished, Route card, Job card
D. Work center card, Route card, Operation card
Answer: C

3. When substituting an item in a BOM on a started production order, it is necessary for the production planner to delete the material consumption from one of the BOM lines. Material consumption is reported and posted on the production order. What should be done to properly record the actual material consumption?
A. Set the status back to Created and delete the production order.
B. Issue the additional material consumptions.
C. Set the status back to Cost estimated.
D. Create a new production picking list journal and create two lines one to decrease, and the other to enter consumption on the new item.
Answer: D

4. Which of the following are possible job types in the routing group? Choose the 2 that apply.
A. Queue before
B. Phantom
C. Setup
D. Subcontractor
Answer: CD

5. Which of the following kinds of information are set up requirements in other modules, before the Production module can be used? Choose the 2 that apply.
A. Company information
B. Items
C. Journal names
D. Routes
Answer: AB

6. Which of the following is the most accurate way to describe the work center structure in Microsoft Dynamics AX?
A. The companys work centers are divided into two levels, with the higher level being routing groups and the lower level being cost categories.
B. They are defined hierarchically, with an unlimited number of levels.
C. The companys work centers are divided into two levels consisting of work center groups and work centers.
D. The work center definitions in Microsoft Dynamics AX are composed of three tiers, work center groups, work centers and sub-contractor work centers.
Answer: C

7. Which of the following actions is NOT possible in the BOM Designer?
A. An item can be dragged from the Items table and dropped in the current BOM-tree.
B. An item can be dragged from the BOM tree and dropped in the route to indicate which operation the item is used in.
C. BOM lines can be deleted from the BOM.
D. By clicking on the operation in the route, all related items can be seen.
Answer: D

8. Without selecting "accept error," when can a production order be reported as finished?
A. When reporting on the last operation from a route or job card journal.
B. When reporting on any operation from a route or job card journal.
C. When reporting on the first job on the work center.
D. When releasing the production.
Answer: A

9. A production order goes through a series of updating jobs, step by step. The stage or states of a production is called the 'Production order status.' Which of the following 'Production order status' statements is true?
A. The names assigned to the states are in alphabetical order to make it easier to recall the correct sequence.
B. An authorized user is allowed to update the production order status from 'Created' to 'Report as finished', skipping all of the updating jobs in between.
C. When a 'Scheduled' production order's BOM is modified, the production order is already cost estimated, so there is no way to update the estimated cost.
D. Prior to a production order being 'Ended' the production order status can be reset to a previous status in the cycle.
Answer: D

10. A company has limited capacity on its' machines, but the capacity of the operators is unlimited (already set on the work center). The team manager wants to plan on the machinery and see the required staff hours in the production plan. What setup BEST meets the managers requirements?
A. The route is set up with two operations with different operation numbers, one to control the operator and one to control the machinery. Schedule with finite capacity.
B. The Route is set up with two operations with the same operation number, one to control the operator and one to control the machinery. Schedule with finite capacity.
C. The route is set up with the use of priority on operations, and scheduling is done with infinite capacity.
D. The route is set up with the use of priority on operations. The scheduling is done with infinite capacity, and the task group is created on the operators resource.
Answer: B

11. When using 'Job scheduling', what planning principle is available, that is NOT available with Operation scheduling?
A. Planning with queue times
B. Planning on task groups
C. Planning with resource efficiency percent
D. Planning with transportation times
Answer: B

12. What occurs if a production order is released and it has not been estimated or scheduled?
A. Those steps are skipped.
B. The estimation and scheduling steps are performed automatically.
C. The status is reset to 'Started.'
D. An error message is displayed and the estimation and scheduling steps must be done manually.
Answer: B

13. When calculating a sales price for a BOM from a sales order line, where is the profit-setting selected?
A. In the Inventory management parameters
B. On the BOM lines
C. In the BOM report as finished journal
D. In the BOM calculation
Answer: D

14. Which of the following does NOT represent a stage or step in the Production Life Cycle in Microsoft Dynamics AX?
A. Report as finished
B. Create
C. Start
D. Version control
Answer: D


Click Online chat to talk with us , get more informations about Microsoft Microsoft Business Solutions MB6-511 practice exam study guides questions and answers

Test4pass MB6-511 Exam Features

Quality and Value for the MB6-511 Exam

Test4pass Practice Exams for Microsoft MB6-511 are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development.

100% Guarantee to Pass Your MB6-511 Exam

If you prepare for the exam using our Test4pass testing engine, we guarantee your success in the first attempt. If you do not pass the Microsoft Business Solutions MB6-511 exam (ProCurve Secure WAN) on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.

Microsoft MB6-511 Downloadable, Printable Exams (in PDF format)

Our Exam MB6-511 Preparation Material provides you everything you will need to take your MB6-511 Exam. The MB6-511 Exam details are researched and produced by Professional Certification Experts who are constantly using industry experience to produce precise, and logical. You may get questions from different web sites or books, but logic is the key. Our Product will help you not only pass in the first try, but also save your valuable time.

MB6-511 Downloadable, Interactive Testing engines

We are all well aware that a major problem in the IT industry is that there is a lack of quality study materials. Our Exam Preparation Material provides you everything you will need to take a certification examination. Like actual certification exams, our Practice Tests are in multiple-choice (MCQs) Our Microsoft MB6-511 Exam will provide you with free MB6-511 dumps questions with verified answers that reflect the actual exam. These questions and answers provide you with the experience of taking the actual test. High quality and Value for the MB6-511 Exam:100% Guarantee to Pass Your Microsoft Business Solutions exam and get your Microsoft Business Solutions Certification.

Test4pass MB6-511 exam
Test4pass MB6-511 pdf exam
Test4pass MB6-511 braindumps
Test4pass MB6-511 study guides
Test4pass MB6-511 trainning materials
Test4pass MB6-511 simulations
Test4pass MB6-511 testing engine
Test4pass MB6-511 vce
Test4pass MB6-511 torrent
Test4pass MB6-511 dumps
free download MB6-511
Test4pass MB6-511 practice exam
Test4pass MB6-511 preparation files
Test4pass MB6-511 questions
Test4pass MB6-511 answers

http://www.test4pass.com/MB6-511-exam.html The safer.easier way to get Microsoft Business Solutions Certification .


Guarantee | Buying Process | F.A.Q. | Payment | Refundment Term | Semples | Testing Engine | privacy | Contact | Sitemap 1 2 3 4

Copyright©2006-2009 sale test4pass Limited. All Rights Reserved

sale test4pass materials do not contain actual questions and answers from Microsoft's Cisco's Certification Exams.